How did the lights stay on in South Australia?
This shortish post picks up just one of the many themes arising from Friday 31 January’s extraordinary events and outlined in this overview relating to the sudden islanding of the South Australian system after the 500kV backbone connection running through southwestern Victoria was severed by six transmission towers west of Geelong collapsing in high winds.
This separation led to a near-instantaneous swing of over 1,000 MW on the Heywood interconnector between South Australia and Victoria, from exporting 500 MW out of South Australia to suddenly importing over 500 MW from Victorian generation remaining connected on the western side of the collapsed lines.